MUZIZI HYDROPOWER PROJECT, UGANDA
Under Implementation (2021)
Owner: Uganda Electricity Generation Company Ltd. (UEGCL)
Employer: KfW-Development Bank, Germany
Muzizi HPP is a run-of-river high head (450 m) peaking plant located in the East African Rift close to Lake Albert with a 2.5 km headrace tunnel, 430 m long pressure shaft and 1.5 km pipe gallery. A surface powerhouse will have an installed capacity of 47 MW capable to generate 240GWh.
Tasks Performed: Tender Documents review and bids evaluation